147
148 FOURTH FIVE YEAR PLAN
ANNEXURE II
Pattern of Utilisation of Electrical Energy Consumed (including
Consumption in Self-generating Industrial Establishment)
(in million kwh)
class of utilisation 1960-61 1965-66 1968-69
no.
(0) (1) (2) (3) (4)
1 domestic or residential
light and small power 1492.3 2355.1 3197.8
2 commercial light and small power 847.7 1650.1 1978.2
3 industrial power 12388.2 22409.6 30483.3
4 traction 453.9 1154.3 1252.3
5 public lighting 193.2 279.6 401.5
6 irrigation 832.9 1891.8 3289.3
7 water works and sewage pumping 436.2 625.2 797.6
8 total energy sold 16644.4 30365.7 41400.0
POWER 149
ANNEXURE III
Benefits in the Fourth Plan from Generation Schemes Included in the
Fourth Plan-Public Utilities
sl. scheme benefits
no. during
fourth plan
(in megawatts)
(0) (1) (2)
1 continuing schemes (2+56+62) 8269.4
2 states 6377.4
3 Ramagundem thermal scheme extension
(Andhra Pradesh) 62.5
4 Kothagudem thermal station extension
Stage III (Andhra Pradesh) 220.0
5 Umiam H.E. scheme Stage II (Assam) 18.0
6 Garo Hills thermal station (Assam) 5.0
7 Namrup thermal station extension (Assam) 30.0
8 Gauhati thermal station (Assam) 30.0
9 Barauni thermal station (Bihar) 100.0
10 Pathratu thermal station (Bihar) 250.0
11 Kosi H.E. scheme (Bihar) 20.0
12 Pathratu thermal station extension (Bihar) 220.0
13 Subernarekha H.E. scheme (Bihar) 65.0
14 Dhuvaran thermal station extension (Gujarat) 280.0
15 Gas turbine (Gujarat) 54.0
16 Ukai H.E. scheme (Gujarat) 300.0
17 Upper Bari Doab canal H.E. scheme (Punjab) 45.0
18 Beas (Dehar Power station)
(Haryana-Punjab-Rajasthan) 165.0
19 Faridabad thermal station extension (Haryana) 55.0
20 Kalakote thermal station (Jammu and Kashmir) 15.0
21 Chenani H.E. scheme (Jammu and Kashmir) 23.0
22 Sumbal H.E. scheme Stage I (Jammu and Kashmir) 22.0
23 Kuttiadi H.E. scheme (Kerala) 75.0
24 Idikki H.E. scheme (Kerala) 260.0
25 Ranapratap H.E. scheme (Madhya Pradesh
and Rajasthan) 43.0
26 Jawaharsagar H.E. scheme (Madhya Pradesh
and Rajasthan) 99.0
27 Satpura thermal station
(Madhya Pradesh and Rajasthan) 62.5
28 Vaitarna H.E. scheme (Maharashtra) 60.0
29 Koyna H.E. scheme Stage ITT (Maharashtra) 320.0
30 Purli thermal station (Maharashtra) 60.0
31 Bhatgar and Vir H.E. schemes (Maharashtra) 25.0
32 Nasik thermal station (Maharashtra) 280.0
33 Koradi thermal station (Maharashtra) 240.0
34 Sharavathi H.E. scheme Stage II (Mysore) 178.2
35 Sharavathi H.E. scheme Stage III (Mysore) 178.2
36 Dzuza H.E. scheme (Nagaland) 1.5
37 Talcher thermal station (Orissa) 62.5
38 Balimela H.E. scheme (Orissa) 360.0
39 Parambikulam H.E. scheme (Tamil Nadu) 155.0
40 Basin Bridge thermal station (Tamil Nadu) 30.0
41 Ennore thermal station (Tamil Nadu) 330.00
42 Ennore thermal station extension (Tamil Nadu) 110.00
43 Kodayar H.E. scheme (Tamil Nadu) 100.0
44 Kundah H.E. scheme Stage IV (Tamil Nadu) 110.0
45 Yamuna H.E. Stage I (Uttar Pradesh) 28.0
46 Yamuna H.E. Stage II (Uttar Pradesh) 240.0
47 Obra thermal station (Uttar Pradesh) 100.0
48 Obra H.E. Scheme (Uttar Pradesh) 99.0
49 Ramganga H.E. scheme (Uttar Pradesh) 120.0
150 FOURTH FIVE YEAR PLAN
ANNEXURE III---contd.
(0) (1) (2)
50 Harduaganj thermal station Stage IV
(Uttar Pradesh) 110.0
51 Obra thermal Station extension (Uttar Pradesh) 300.0
52 Yamuna, H.E. Stage IV (Uttar Pradesh) 10.0
53 Jaldhaka H.E. scheme (West Bengal) 9.0
54 Santaldin thermal station (West Bengal) 240.0
55 Little Ranjit H.E. scheme (West Bengal) 2.0
56 union territories 172.0
57 Indraprastha thermal station V Unit (Delhi) 55.0
58 Nogi H.E. scheme (Himachal Pradesh) 2.0
59 Bassi H.E. scheme (Himachal Pradesh) 45.0
60 Giri Bata H.E. scheme (Himachal Pradesh) 60.0
61 Gumti H.E. scheme (Tripura) 10.0
62 others (63 to 68) 1720.0
D. V. C.
63 Chandrapura thermal station
units IV and V (DVC) 240.0
central 1480.0
64 Neyveli thermal station extension (Tamil Nadu) 200.0
65 Badarpur thermal station (Delhi) 300.0
66 Tarapur atomic power station
(Maharashtra and Gujarat) 380.0
67 Ranapratap Atomic power station (Rajasthan) 400.0
68 Kalpakkam atomic power station (Tamil Nadu) 200.0
69 new schemes (70+50) 830.0
70 states 560.0
71 Bhatinda Thermal station (Punjab) 110.0
72 Ukai thermal station (Gujarat) 120.0
73 new unit in Bihar 110.0
74 new units in Uttar Pradesh 220.0
75 central 270.0
76 Loktak (Manipur) 70.0
77 Siul Baira (Himachal Pradesh) 200.0
78 total (1 + 69) 9099.4
POWER 151
ANNEXURE IV
List of Inter-State and Inter-Regional Links proposed to be Included
in the Fourth Five Year Plan
sl. name of the link voltage and no. route
no. of circuits length
(km.)
(0) (1) (2) (3)
inter-state links
northern region
1 Giri-Yamuna 132 KV S/C 40
2 Pathankot-Chenani 220 KV S/C 115
3 Badarpur-Moradnagar 220 KV S/C 32
4 Pinjore-Shimla 132 KV S/C 60
western region
5 Satpura-Ambazari 220 KV S/C 138
6 Chandni-Bhusawal 132 KV 88
(stringing 2nd circuit)
7 Navasari-Nasik 220 KV S/C 53
southern region
8 Munirabad-Hampi 220 KV S/C 26
9 Pamba-Kayattar 220 KV S/C 100
10 Idikki-Udumalpet 220 KV S/C 112
11 Ennore-Nellore 220 KV S/C 141
12 Kundah-Mysore 220 KV S/C 130
eastern region
13 Chandrapura-Santaldih 220 KV S/C 56
14 Chandil-Joda 220 KV S/C 135
15 Chandrapura-Durgapur
(DVC)-Durgapur (W.B.) 220 KV S/C 160
16 Noamundi-Joda 132 KV S/C 20
17 Purnea-Siliguri 132 KV S/C 176
north-eastern region
18 Badarpur-Jirighat 132 KV S/C 64
19 Imphal-Bokajan 132 KV S/C 143
inter-regional links
20 Belgaum-Kolhapur 220 KV S/C 99
21 Mughalsarai-Dehri 220 KV S/C 123
22 Alipurduar-Bongaigaon 132 KV S/C 108
23 Upper-Sileru-Balimela 220 KV S/C 40
152
153